Schlosssteg Waidhofen an der Ybbs Waidhofen an der Ybbs, Österreich Subject of the contract was the demolition of the old bridge as well as the planning and new construction of the new bridge at the same place. The existing infrastructure and the neighbouring buildings have to be particularly considered for the construction and design of the new bridge. The adjacent area has to be restored. Existing infrastructural lines have to be integrated into the new bridge. Cooperation: Swietelsky with VCE and Hertl.Architekten