Repair works at the two-track railway route Bucharest–Brasov between Campina and Predeal, under full maintenance of operation. The scope of work for the 48 km long section comprises the foundation (earthworks), the track superstructure as well as the required slope securing measures including river engineering. The section includes the railway stations Campina, Comarnic, Valea Larga, Sinaia, Busteni and Azuga, their buildings and structural facilities (platforms etc.), which should be also generally rehabilitated.
Services: Detailed structural design of the sections Campina, Comarnic and Busteni