Wienerwaldtunnel © VCE
Wienerwaldtunnel © VCE

Wienerwald Tunnel

Austria

The 13.35 km long Wienerwaldtunnel – directly connected to the Lainzer Tunnel – is equipped with a ballastless track and in some sections with floating track slabs.

Services: Construction design, tender and detailed structural design of the superstructure, logistic design, design coordination, health and safety plan of the whole interior work