Structural Health MonitoringStructural Inspection / Main Inspection A1 Aurach Bridge S125 The bridge inspection comprises the main bridge inspection according to RVS 13.03.11. The bridge consists of a six-span composite cross section with a total length of 420 m. Client: ASFINAG