The Bridge across the Elbe is a three-span reinforced concrete bridge with a total length of 90m (30/30/30) and a width of 7,02m. The two-lane road bridge was built in 1924. In the course of the prevailing investigation a dynamic monitoring campaign was undertaken to determine the condition of maintenance and the load bearing capacity of the bridge by means of BRIMOS® Structural Health Monitoring.