News

01.12.2017

Launch of VDE 8

December | 2017

The launch of the approx. 500 km long traffic project Nürnberg-Berlin (VDE 8) is planned for 10 December 2017. This project shortens the travelling time from Munich to Berlin by railway to only four hours. The section Ebensfeld – Ilmenau (VDE 8.1) is a double-track electrified railway route for the high-ranking passenger and freight traffic with a length of approx. 66 kilometres and a maximum speed of 300 km/h.

VCE carried out the track system in form of a ballastless track of the sections VDE 8.2 (in operation since 12/2015), VDE 8.1 Lot Centre and Lot South on a length of approx. 160 km.

Services: Approval design, detailed structural design, as-completed drawings, participation in launching, bridge checks, noise protection design incl. foundation and noise assessment

> to the project
> to the project VDE 8.2 measurement

01.11.2017

Combi Coop II – Combined Freight Transportation Independent of Terminals

November | 2017

Rail instead of road transport – project for a faster and more effective transportation of container goods from the factory to the railway via freight vehicle without transaction at a terminal. The first test transport of the combined freight transportation independent of a terminal was carried out in southern Burgenland (Austria) with the well-established MOBILER-System of the Rail Cargo Group. Containers can be handled quickly and straightforwardly between freight vehicles and railway-cars almost everywhere by means of special container shifting systems – by one single person, without any assistance and without costly terminal equipment.

The project “Combi Coop II” was nominated as one the 5 top candidates of the 2017 VCÖ Mobility Award in the category “Energy-efficient freight traffic”.

Project partners are nine companies from the southern Burgenland region as well as a forwarding company.

Client: Project funded by AWS (Austria Economic Service)

Service: Traffic design

19.10.2017

Employee with a high interest in Measurement and Instrumentation (m / f )

Production and installation of measurement systems

For our headquarters in Vienna we are searching for an

Employee with a high interest in Measurement and Instrumentation (m / f )

for supporting our team in the field of production and installation of measurement systems in an international environment.

Your tasks will comprise

  • Cooperation in the planning, production and installation of measurement systems
  • Design and documentation

Your Profile

  • Degree of Technical College / Advanced Technical College / University of Technology in the sector structural or electrical engineering or mechatronics
  • Skills in MS Office und AutoCAD
  • Five years of professional experience in construction or construction-related industries, at best experience in field work
  • Self-reliant and active working style, high degree of ability to work in a team and inventiveness
  • Willingness for advanced training
  • Willingness to travel
  • Excellent skills in German and English

Our offer

  • Pleasant working atmosphere – excellent communication skills are expected and offered
  • Attractive social benefits (personnel rotation – mentoring, health and fitness programme, lunch allowance etc.)
  • Support of professional training and further personal development

In accordance with the legal obligations we would like to inform you that a minimum gross salary of € 2,011.-/month (40 hours a week) is provided for the above-mentioned position for persons with a degree of a technical college and € 2,508.- for those with a degree of an advanced technical college or a university of technology according to the valid collective agreement. Your salary will be individually agreed with you depending on your qualification and experience!

Have we aroused your interest and can you identify with the above-mentioned profile description? We would like to get to know you! We are looking forward to your detailed application consisting of a motivation letter and a curriculum vitae as well as information on the earliest possible start date and your salary requirement addressed to:

Ms. Birke Schönwetter
schoenwetter@vce.at
VCE Vienna Consulting Engineers ZT GmbH
Untere Viaduktgasse 2, 1030 Vienna

01.10.2017

Shared Zone Waldegg

October | 2017

A shared zone was established in front of the new vocational training school in Waldegg in compliance with the citizens. The shared zone has a length of 315 m and an area of 5850 m².

For an improvement of recreational opportunities part of the existing park got a facelift by additional seating furniture and a small lake.

In due time for the opening of the shared zone on Sunday, 17 September 2017, the reconstruction of the provincial vocational school and the object for assisted living were completed.

Architect: Architect Weidinger

01.09.2017

Launch of Extension of U1 South

September | 2017

On 2 September 2017 the new extension of the underground railway line U1 will start operation with 5 new stations. VCE had the tasks of check engineer, railway consultant (§31a und §34b) and construction coordinator for lot U1/10 (Troststrasse), check engineer and railway consultant for lot U1/8 (Alaudagasse) and designer for lot U1/13 (turnout facility Favoritenstrasse).

The construction methods comprised the whole spectrum of civil and underground engineering (earthwork, cut-and-cover method, bored piles, relocation of installations, underpinning and protective screen of buildings with jet grouting, tunnel construction with shallow excavated cross sections of up to 120 m² under existing buildings) as well as of interior fitting (steel construction, glass structures, masonry) and could be successfully implemented meeting the respective deadlines.

The scope of services of VCE also comprised track design in the area of the turnout shaft Volkspark (U1/8), noise and vibration protection design of the lots U1/8 and U1/13 – U1/15 as well as traffic design in the area of the lots U1/13 – U1/15.

Client: Wiener Linien GmbH & Co KG

Services: Check engineering, Site supervision and safety on site, Structural design of superstructure, Structural design, Traffic design

,
01.08.2017

Wind Park Meerwind South / East

August | 2017

The project Meerwind South / East consists of the two offshore wind parks Meerwind South and Meerwind East, which were planned and constructed 23 km north of Helgoland island in the North Sea and are maintained from Helgoland. The wind park comprises a total of 80 wind energy plants with a performance of 3.6 megawatt each. The network is supplied with a performance of up to 288 MW via a transformer platform.

The foundations (mono-piles and transition pieces) of all 80 wind turbines are equipped with a condition monitoring system by Airwerk GmbH for permanent condition monitoring and monitoring of the ageing behaviour (fatigue). All measurement data are transmitted to an onshore server, analysed by software routines and all results are made available to the client in a web-user interface.

Client: Airwerk GmbH

Services: Software for data transmission, software for data analysis, web-user interface, support in the preparation of the monitoring reports for the authorities

11.07.2017

BIM und IHR Mehrwert (BIM and YOUR added value)

01.07.2017

School for Pupils between 6 and 14, Spielmanngasse, Vienna

July | 2017

The project provides for the new construction of a school for children aged 6 to 14 as well as an annex to an already existing elementary school building.

The new school for 6 to 14-year-olds is designed as compact structure with five floors. Attached to the back side is a structure with two half-buried gym halls. A side wing consisting of a waste disposal room and a flying roof creates an atrium as well as a rest zone on the flat roof of the first floor. The open spaces of the school are suitably designed for pupils and instruction.

The three-storeyed structure of the annex to the elementary school is compactly connected to the existing building and complements the available space with the required educational and secondary rooms.

Both school buildings are currently in the detailed structural design phase. Construction will start on 17 July 2017.

Client:MA 56 (Vienna’s municipal authorities) represented by WIP Wiener Infrastruktur Projekt GmbH

Services in consortium with CPPA & Fellerer Vendl: static and structural design, design-build, coordination of construction works, site supervision, building physics, check engineer according to Vienna’s building code

13.06.2017

ÖAMTC Headquarters Win the 6th Austrian Steel Construction Award

In the course of the Austrian Steel Construction Day in Graz the winners of the 6th Austrian Steel Construction Award were announced. The prize was awarded to the ÖAMTC headquarters in Vienna.

> 6. Österreichischer Stahlbaupreis

08.06.2017

Mariahilfer Strasse wins “2017 Place Design Award”!

The EDRA Great Places Awards recognize professional and scholarly excellence in environmental design and pay special attention to the relationship between physical form of the built environment and human activity or experience. 

The 2017 Place Design Award goes to Mariahilfer Strasse in Vienna—a previously traffic-heavy 19th century shopping boulevard that has been transformed into an inviting, pedestrian-friendly avenue.

> to the project

01.06.2017

Metro Doha

June | 2017

Four underground railway lines are being constructed on a total length of 172 km in Doha, Qatar, in the scope of phase 1 of the Doha Metro project. At the end of May track slab design was approved by the Design Verification Engineer DVE. Furthermore the noise and vibration assessment was completed and the effectivity of the mass-spring systems was verified in a 1:1 in-situ test.

The track system is currently under construction. It is designed as ballastless Porr slab track system including light and heavy mass-spring systems as required. All in all approx. 80% of the precast track slabs have been already produced and are being installed continuously. The section comprises tunnel, at-grade and bridge sections. In addition turnout areas and the associated transition areas on ballastless track were developed and planned. The track design was revised and adapted for the installation of the slab track system.

VCE carried out noise and vibration assessment determining emission reduction measures (e.g. mass-spring systems) for providing the protection targets regarding vibrations, ground-borne noise and airborne noise. In order to verify the effectivity of the proposed mass-spring systems, true size mock-ups were installed, tested and their performance was verified.

The section of Phase 1 is to be put into operation in 2020, in due time before the start of the Football World Cup in 2022.

Service: Project development and system configuration, concept and detailed design total track system, alignment, noise and vibration protection design, measurements on site

Client: Porr Qatar Construction WLL

> to the project

,
24.05.2017

BIM and YOUR added Value

VCE invites you to the BIM event "BIM und IHR Mehrwert" (BIM and YOUR added value) in ÖAMTC’s mobility centre on 20 June 2017.

Please register by 13 June 2017 with linsbauer@vce.at

> PDF . BIM invitation

24.05.2017

VCE Prize Winners 2016

On Thursday, 11 May 2017, the VCE INNOVATION PRIZE for Excellent Research in Civil Engineering 2016 was awarded to Dr. Roman WENDNER and Dr. Johannes PISTROL at the University of Natural Resources and Applied Life Sciences in Vienna.

> more information

01.05.2017

Life Ball 2017

May | 2017

This year the charitable association LIFE+ organizes the AIDS charity event “Life Ball“, which is recognized worldwide, again. National and international non-profit organizations, which support persons affected by HIV, are funded with the net profit of the Life Ball. This year’s topic #Recognize the Danger runs like a creative thread through the weekend of events and welcomes the visitors as oversize figure at the entrance of Vienna’s city hall.

VCE supports the initiative with the service of design and building site coordination according to the building site coordination law for the “event site” Life Ball 2017 in the area of Rathausplatz and in the event rooms of the city hall.

Client: Life+ association for direct support of HIV-positive persons and persons down with AIDS

Service: Health and safety engineering

01.04.2017

New Appearance for Stephansplatz

April | 2017

Stephansplatz is one of Austria‘s most prominent places due to St. Stephen’s Cathedral. Therefore this important central square shall be completely refurbished and its surface redesigned. For this purpose 36,400 granite slabs and stones are laid. In addition 1,500 t of asphalt concrete and 5,500 t of drain concrete are installed. Apart from surface assembly a second drainage level for the protection of the subterranean structures (catacombs and Virgil Chapel) is established. Furthermore, essential parts of the installations are relocated or renewed.

The construction works started in March 2017 and shall be concluded by November 2017.

Client: MA 28 – Vienna’s municipal authorities for road administration and construction, in cooperation with Kirsch ZT GmbH

Services: Traffic design, project control, tender

01.03.2017

Refurbishment of Volkstheater

March | 2017

Volkstheater will be completely refurbished in three construction phases in the summers of 2017, 2018 and 2019. The main objectives are an improvement of operation and increased comfort for the audience.

Currently the project is in the phase of basic design with advanced submission of architectural design. Furthermore there is continuous coordination with the authorities and the Antiquities and Monuments Office.

Client:Volkstheater GmbH

Services:Project management, static and structural design, tender / cost estimation, building physics, fire protection design

01.02.2017

Remedial Actions at the Bank of the Danube Canal – Abutment

February | 2017

At the left bank of the Danube Canal, at river kilometre 7.355, serious settlements as well as material erosion due to scouring was determined for one abutment. Therefore a renovation of the side wall on a total length of approx. 130 metres was required. The remedial actions were implemented by an additional sheet pile wall.

The new sheet pile wall shall be completed in March 2017.

Services: Tender, structural design, site supervision, construction coordination

01.01.2017

ÖAMTC Headquarters

January | 2017

On 5 December 2016 the new ÖAMTC headquarters in Erdberg was put into operation.

ÖAMTC concentrated the former eight administrative sites in Vienna in one new building with a size of 25,000 square metres and established new headquarters with an office area, support functions, member service and a heliport. The new centre shall take care of approx. 75,000 members and clients.

The project was handled by Pichler & Traupmann architects as general design managers in cooperation with VCE. The building was continuously planned from preliminary design up to detailed design with a joint three-dimensional BIM model.

Services: Preliminary design, design, submission design, tender design, foundation concept, detailed project, detailed design, check engineering and notification of completion according to Vienna’s building regulations, project control

01.12.2016

City Tower Vienna – Refurbishment of the Glass and Stone Facade

December | 2016

The project City Tower Vienna was successfully concluded in November.

In the course of the maintenance of the building the exterior toughened safety glass panels of the facade were exchanged with laminated safety glass. All in all approx. 7,250 m² or approx. 2,850 glass panes were substituted.

In parallel the total natural stone facade was inspected and refurbished. Furthermore safety measures regarding accessibility and guardrails were planned and implemented.

Client: City Tower Vienna Errichtungs- und Vermietungs-GmbH

Services: Design, tender, contracting and site supervision

22.11.2016

Moving to the Centre

New Year – New Office

WE ARE MOVING. We would like to inform you that we are moving to a new address.
We are moving to the centre of Vienna! From 12 December 2016 our new address is:

VCE Vienna Consulting Engineers ZT GmbH
Untere Viaduktgasse 2, 1030 Wien

We kindly ask you to update your database and are looking forward to welcoming you!

Important information:
Please note that our office cannot be reached by phone or e-mail between 7 Dec. 2016, 2 p.m. and 11 Dec. 2016 12 p.m.

 

21.11.2016

European Steel Bridge Award 2016

OTS-Aussendung

We would like to inform you that the Austrian Steel Construction Association published the following announcement on the "European Steel Bridge Awards".

You can find the announcement under the following link:
http://www.ots.at/presseaussendung/OTS_20161121_OTS0022

14.11.2016

European Steel Bridge Award 2016

Winner Special Engineering Award

VCE received the Special Engineering Award of the ECCS for outstanding consultancy and design services for the Botlekbridge in the Netherlands.

The European Steel Bridge Awards are given by ECCS every two years to encourage the creative and outstanding use of steel in construction of bridges.

> Link to the Award

01.11.2016

Environmental Noise Directive 2017 – Noise Maps Agglomeration Vienna

November | 2016

Within the scope of the EU-wide Enviromental Noise Directive (END) enacted in 2002 strategic noise maps and noise action planning are published every five years (laerminfo.at).

In Vienna’s city region the noise of all roads, tracks and Integrated Pollution Prevention and Control (IPPC) sites is visually represented on two-dimensional coloured maps. Furthermore the noise levels at principal residences are determined and summarized in tables, separated according to the sound source. The calculation comprises the total urban area of Vienna with 414 km² and contains more than 80 million calculation points.

Rail sources in Vienna’s urban area include ÖBB rail tracks, underground railway and tram lines of Vienna’s public transport services and tracks of local railway lines. Motorways and express highways as well as general public traffic routes in the city area are considered as road sources. In the city area of Vienna there are 28 IPPC sites (as of 2012), which are also displayed in the strategic noise maps.

Services: noise mapping, acoustic calculations of railway, road and site noise.

01.10.2016

U5 Berlin – Completion of the Structural Works at Station Rotes Rathaus

October | 2016

On 7 September a topping-out ceremony and an open building site day took place on the occasion of the completion of the preliminary structural works of the underground railway station Rotes Rathaus.

The project “Lückenschluss U5” extends the previous U5 Line from Alexanderplatz to Brandenburger Tor and merges it with U55 there. Apart from 2.2 kilometres of tunnel routes, three new railway stations “Unter den Linden“, “Museumsinsel“ as well as “Rotes Rathaus” are constructed in the centre of Berlin.

Seven centrally arranged supports carry a major part of the floor load in the station “Rotes Rathaus“. The column heads look like mushrooms due to their funnel shape and shall remind of the old vault of the medieval town hall. 

Construction works and surface restoration shall take place after the completion of the structural works. The opening of the total route of the U5 is expected in 2020.

Client: BVG Berliner Verkehrsbetriebe

Design of Station Rotes Rathaus: Collignon Architektur

Services: Services in consortium with artus Architekten and Schüsslerplan: Project control, site management, site supervision of structural works, finishing works, cable routeing

01.09.2016

Bearing Replacement Reichsbrücke

September | 2016

In the course of the structural survey of the Reichsbrücke it was detected that certain pot bearings had no sufficient sliding gap anymore. Therefore the existing pot bearings are dismounted and replaced with new cup and ball bearings in autumn 2016. The bearing exchange is carried out without any interruption of the traffic.

Services of VCE: Bridge inspection, tender design, structural design

01.08.2016

WIENeu Hoerbiger

August | 2016

Opening of the New Hoerbiger Site

The new building of the administrative and production site of the company HOERBIGER in Seestadt Vienna-Aspern was inaugurated after two years of construction.

A modern building was erected with the objective to bring together workers from production and employees from administration. Due to the utilization and the ecological objectives requested by the city of Vienna (Total Quality Building [TQB]) high demands regarding planning were given. The building stands out due to its three cantilevers in the entrance area as well as the green atrium and the open architecture.

Client: querkraft architekten zt gmbH

Services: internal design coordination, site supervision, traffic design, acoustic measurements, design and building site coordination as well as project management, basis for cost estimation

01.07.2016

Libelle - Vibration Monitoring Leopold Museum

July | 2016

A pavilion named “Libelle” for future utilization for events is built on the roof of Leopold Museum.

Extensive measurements and analyses were carried out in May 2016 in order to be able to assess the impacts of the vibration intensive construction activities in the course of the erection of the level on the roof structure of the Leopold Museum on the exhibition rooms and art objects in the interior of the building,

In this process the vibrations occurring were determined during test drillings at the facade of the Leopold Museum at the positions with paintings deserving particular protection (Schiele, Klimt).

In coordination with the representatives of the client recommendations for safe assembly during the construction works were elaborated based on the results (relocation of especially critical objects, elastic storage of all wall paintings).

Services: Design management, tender processing, site supervision, construction coordination (construction site coordinator), check engineering, structural dynamics and vibration protection

to the Services "Dynamic & Vibration Protection"

 

,
31.05.2016

Steibrua – Network Arch Bridge in Norway

June | 2016

The existing, approx. 95 m long, network arch bridge consists of a timber arch and a prestressed concrete bridge deck, which is suspended by means of 68 prestressed steel rods (MacAlloy system).

The aim of the current investigation was the measurement-based determination of the effective forces of all 68 rods of the network arch bridge during the individual construction phases and 12 months after completion with BRIMOS® Structural Health Monitoring.

The basis for investigation was geometrical information on all tie rods and the corresponding product specifications. According to the bending beam theory of mechanical engineering an analysis tool for the determination of the tension forces was established on the basis of the measured eigenfrequencies and applied in the course of the attendant dynamic construction element measurements.

Services: Methodology for the determination of the tension forces in the existing construction element series, dynamic measurement of all bridge anchoring devices, periodic determination of the tensioin forces in all hangers

01.05.2016

LIS-03 - Modernization of the Sewage System in Doha

May | 2016

Ashghal (Public Works Authority), the Qatari authority responsible for all infrastructure projects, realizes the so-called IDRIS Programme (Inner Doha Resewerage Implementation Strategy) for comprehensive extension and fundamental modernization of the sewage system in Doha in order to cope with the requirements of the considerably growing population.

VCE is involved as Quality Control Engineer (QCE) in the project LIS-03, the lot for the design and construction of the two interceptor sewers Mesaieed Industrial City (MIC) and Utility Corridor Lateral (UCL).

In this project four micro-tunnel boring machines are used for the construction of the deep gravity sewer with an internal diameter of 1.6 m and a total length of approx. 21 km. All in 47 shafts with depths up to 45 m have to be established for the operation of the micro-tunnel boring machines and installation of the jacking pipes.

The services as Quality Control Engineer comprise the review and the approval of the design as well as the quality control in construction.

On 27 April 2016 the ground-breaking ceremony for the first shaft took place in Al Wakrah.

Picture above: Manoj Bajaj (HBK), Luis Fagundes (Ashgal), Sheikh Ali Bin Hamad Al Thani (HBK), Georgios Ntigkmpasanis (HBK), Bill VanWagenen (ch2m), Bassam Halabi (GHD)

Picture below - VCE Team v.l.n.r.: Roberto Bontoyan, Charlou Velasco, Ariel Papica, Ramil Macalalad, Cristian Giurgea, Houman Foroutan, Ernst Forstner

LINK TunnelTalk

 

01.04.2016

Herrengasse

April | 2016

After numerous adjustment processes the road surface project Herrengasse was released for implementation. The privately financed road project represents an important axis between Freyung and Michaelerplatz. In this section several palaces, hotels, ministries, Vienna’s first high-rise building and the Loos house are located. Apart from Herrengasse, Fahnengasse and parts of Wallnerstrasse are reconstructed as well.

With the implementation of the project this area receives an adequate surface for underlining historically important buildings. Apart from the new high-quality pavement (Austrian granite), lighting is also brought to the state of the art. The existing traffic organization is modified to a shared zone, which creates more areas for pedestrians and pavement cafés.

The preliminary works – installation of fixtures – will start at the beginning of April 2016, the actual surface works will start at the end of May 2016. The conclusion of the works is expected by mid-November 2016.

Client: HG+ Interessentengemeinschaft Herrengasse

Services: detailed design, tender design, project control, traffic design

01.03.2016

Doha Metro Trackwork

March | 2016

In the scope of Phase 1 of the Doha Metro project four underground railway lines shall be constructed on a total length of 172 km. The track system is designed as ballastless track with Porr slab track system and some sections as mass-spring systems. The design comprises tunnel sections, at grade sections, tracks on viaducts as well as turnout areas and the associated transition areas. As basis of the layout of the ballastless track the available alignment is revised and adjusted by VCE.

VCE carries out analyses on the requirement of emission reduction measures (e.g. mass-spring systems) for providing the protection targets regarding vibrations, ground-borne noise and airborne noise. Extensive measurements were performed on site as a basis for these calculations.

The production of the track supporting layers manufactured as prefabricated parts on site has already started, whereas the installation of the tracks is expected to begin in autumn 2016. The route of Phase 1 shall be put into operation in 2019, in due time for the start of the Football World Cup in 2022.

Client: Porr Qatar Construction WLL

Services of VCE: Project development and system configuration, concept and detailed design total track system, alignment, noise and vibration protection design, measurements on site.

> to the project

,
01.02.2016

St. Josef Hospital lays the Foundation Stone for a New Building

February | 2016

On 21 January 2016 the foundation stone ceremony for the new building took place with the participation of politicians, staff members of the hospital and neighbours.

Obstetrics and oncology have already been among the focuses of the St. Josef Hospital for some time. This specialization shall be even intensified in future. Core piece is an annex which shall be opened in 2018. The extension shall result in an increase of capacities from 2000 to 3000 births as well as in the realization of the development to a specialized clinic for oncology. Up to 2020 the existing building shall be also comprehensively rehabilitated. The reconstruction is carried out without any interruption of hospital operation.

Completion phase 1: 2018
Completion phase 2: 2020

Services: site supervision

14.01.2016

FRESH VIEW on Smart Cities

VCE will be presented on a full page in the issue of FRESH VIEW on Smart Cities.

The magazine in German and English will be distributed to more than 110 branches of the Austrian Federal Economic Chamber world-wide.

The web version can be found on www.advantageaustria.org

01.01.2016

Gratitude and Delight at the Topping-out Ceremony of the New ÖAMTC Headquarters

Januar | 2016

The topping-out ceremony of the new ÖAMTC headquarters took place on 14 December 2015. After an intensive planning period and a record-breaking construction time the shell construction was completed shortly before the ceremony. Ernst Klobucnik (ÖAMTC - Austrian Automobile, Motorcycle and Touring Club), Franz Lederhas (Granit) and Architect Christoph Pichler (see photo) thank all the persons involved in the project for the excellent and close cooperation. In less than 8 months approx. 20,000 m³ and almost 4,000 t of reinforcement were used in the highly complex structure.

Services: Basic design / general design, construction design, detailed design, foundation concept, preliminary design, quantity survey, structural design, submission design, tender design

23.11.2015

Winner – Austrian Consulting Award 2015

Botlek Bridge – World’s Largest Lifting Bridge

On 20 November 2015 the Ministry of Economics granted the Austrian Award for International Consulting andthereby recognized outstanding engineering consulting services.

The prize winner is VCE Vienna Consulting Engineers ZT GmbH as design manager with the project "Botlekbrücke - die größte Hubbrücke der Welt" (Botlek Bridge – World’s Largest Lifting Bridge).

The jury justified its decision with the unique realization of the project by skilful combination of geotechnical, hydraulic, construction as well as traffic and transport engineering, which shortened the lifting time of the bridge to only 110 seconds.

"The realization of such a big and fast lifting bridge represents a major innovation on the highest international level. Furthermore the project excels due to a considerable increase in capacity of the traffic carriers and a high service life of 100 years even from an economic point of view”, commented the jury.

> to the project

> PDF of the Consulting Award Brochure

> BMWFW.gv.at
> ACA.co.at
> ots.at
> Article Wirtschaftsblatt.at

> Video

13.07.2015

Opening Botlekbrug

The new Botlekbrug over the Oude Maas is now officially opened for the traffic. On Sunday, July 12, 2015, the first cars crossed the bridge in the direction Rotterdam at 10 clock.

The Botlekbrug is the largest lifting bridge of the world and should solve the traffic problems between Rotterdam and the port area Maasvlakte 2.

Services of VCE: Preliminary project, detailed project, assistance with the assembly

LINK www.rijnmond.nl/nieuws/12-07-2015/nieuwe-botlekbrug-geopend

LINK nos.nl/artikel/2046521-eerste-auto-s-vandaag-over-nieuwe-botlekbrug.html

> to the project

23.06.2015

World Port Development / April 2015

Dynamic Structural Monitoring for Condition Assessment and Life-Cylce Managment of Port Facility Structures

Article of Peter Furtner (VCE) and Nigel Nixon (NNP Inc) in the journal "World Port Development", issue April 2015, about dynamic structural monitoring and Life-Cycle Management of port facility structures.

... The application and the benefits for the port industry are - like for all other industries that use dynamic monitoring - to be able to know how safe the structure is and to have decision support as to how long the asset can be operated safely. ...

10.02.2015

Brückenbau – Construction & Engineering

New Botlek Bridge in Rotterdam

Challenging Project for VCE

Contribution on the Botlek Bridge in Rotterdam by VCE in the bridge construction journal "Brückenbau", issue 6 - 2014 by the publishing group Wiederspahn.

> to the project

19.01.2015

architekturjournal wettbewerbe 6/2014

New Danube Bridge Linz, Upper Austria

A report on the realization competition for the new Danube Bridge Linz was published in the December issue of the architectural journal “Wettbewerbe”.

VCE in consortium with FCP Fritsch, Chiari & Partner ZT GmbH and Quist Wintermans Architekten reached the 3rd place in the Linz bridge competition.

20.11.2014

Nomination for the 4th Vienna Engineering Prize

World’s Biggest Cable Crane

The Vienna Engineering Prize is awarded by the city of Vienna in collaboration with the Chamber of Architects and Engineering Consultants for Vienna, Lower Austria and Burgenland every two years. The Engineering Prize recognizes extraordinary engineering services and aims to contribute to a higher perception of the technical professions in the public. This year 31 applications were submitted.

Five engineering teams were nominated for this year’s 4th Engineering Prize. VCE was nominated for the planning and construction of the world’s biggest cable crane.  

> Article: derStandard, 13.11.2014 | PDF

> Certificate: Wiener Ingenieurpreis 2014 | PDF

09.10.2014

Valor Homepage

The new web page of Valor Engineering is online. Thus Valor can present itself even better on the Norwegian market.

Recently Valor succeeded in concluding a framework contract for infrastructure projects with Statens Vegvesen.

» valorengineering.no

16.09.2014

Botlekbrug – Floating Assembly of First Bridge Part

On 13 September the first superstructure of the new Botlek Bridge was successfully assembled and deposited on the temporary bearings.

On Friday, 12 September transport on the pontoon started from the pre-assembly site at the Mammoet-Harbour in direction of the building site.

At approx. 5:00 p.m. the bridge passed the old Botlekbrug observed by many onlookers and was positioned in front of span 40-50.

On Saturday, 13 September at .5:00 a.m. lateral adjustment was started.

At 6:45 p.m. the final position was reached and lowering was begun by means of the low tide.

At approx. 10:30 p.m. the first contact with the bearings took place and at approx. 11:30 p.m. the bridge was removed from the pontoon and successfully put down.
 

Services of VCE: Preliminary project, detailed project, assistance with the assembly

» Video auf youtube

16.09.2014

NERA Results

Research Project
The results of the individual work packages of the research project NERA were summarized in a brochure designed by VCE.

NERA (2010-2014) is an EC infrastructure project that integrates key research infrastructures in Europe for monitoring earthquakes and assessing their hazard and risk.

» Link to NERA-Website

12.08.2014

SYNER-G: Systemic Seismic Vulnerability and Risk Assessment of Complex Urban, Utility, Lifeline Systems and Critical Facilities

Methodology and Applications

Pitilakis, K., Franchin, P., Khazai, B., Wenzel, H. (Eds.)
Springer, 2014

SYNER-G is a research project with a focus on systemic seismic hazards and risk analyses of buildings, lifelines and infrastructures.

A book on the results of the SYNER-G research project was published in 2014 and represents a significant step forward in the seismic vulnerability and risk assessment of complex interacting urban and regional systems and infrastructures.

ISBN 978-94-017-8834-2
ISBN 978-94-017-8835-9 (eBook)
DOI 10.1007/978-94-017-8835-9

LINK SYNER-G – FP7 project

16.07.2014

BIM (Building Information Modelling)

The BIM event on 24 June 2014 organized by VCE under the motto "BIM in Theory and Practice" met with great interest also this year.

The advantages and various applications of BIM were demonstrated to the participants during the symposium lasting for three hours. The programme was presented by Robert Schedler.

Presentations were given by Christian Artaker and Andreas Stocker / Artaker CAD-Systems, Alexander Barnaš / Maba, Gernot Wagner / Porr, Konstantinos Kessoudis / Strabag, Christoph Degendorfer/ PXT as well as DieterDenk / FCP.

09.04.2014

Valor Engineering in TU Bygg

Article about Valor Engineering at TU Bygg.no

Abstract:
AF creates new engineering company
together with Austrian VCE.

Since last summer, the cooperate management of the AF Group worked to create an independent company that will engage in engineering and project management.

You will find the whole article under:
www.tu.no/bygg/2014/03/05/af-gruppen-danner-nytt-engineeringselskap

26.02.2014

Lifted Connection – Austrian Engineering

Solid, No.02 I February 2014

The Botlekbrug – the biggest and most complex lifting bridge ever built – is currently being constructed in Rotterdam.

... Vienna Consulting Engineers are responsible for the design management for all site progress related trades, detailed design, site supervision and project management. The specialists from VCE have successfully handled thousands of building projects world-wide but this project is even unique for them.

> to the project

11.12.2013

A15 Maasvlakte–Vaanplein, Rotterdam, Netherlands

Drone over the Botlekcorridor
25.11.2013

Gap Closure Ceremony VDE 8.2

New Route Erfurt Leipzig / Halle

The tracks for the most modern rail track in Central Germany have been completed.

On 25 November 2013 Ms. Christine Lieberknecht, prime minister of the Free State of Thuringia, and Dr. Reiner Haseloff, prime minister of the German state of Saxony-Anhalt, passed the first continuous and cross-national ride with a test train of the German Railways.

All structures and tracks have been completed to a large extent. Now the newly built route will be equipped with further technical components until 2015.

> to the project

> Press: www.vde8.de

19.11.2013

Celebrating SHM Award

The ISHMII Monitor | November 2013 Vol. 8, No. 2

Congratulation to ISHMII Council member Dr. Helmut Wenzel, Vienna Consulting Engineers, who was honored at the 9th Annual International Workshop on Structural Health Monitoring at Stanford University, California, in September 2013.

13.11.2013

Opening of Kammerspiele Theatre in Josefstadt

In only five and a half months the 100-year-old theatre was completely refurbished. In this extremely short construction period the core of the existing structure was fully removed, the stage portal and the balcony were newly covered with concrete, the stage machinery and the technical building equipment were modernized and the total extension was completed.

At the opening of the refurbished Kammerspiele theatre on 23 October the Broadway musical hit “Catch Me If You Can” was performed as European premiere.

23.10.2013

fib Model Code 2010 Seminar

Design of Concrete Structures with Advanced Methods

On 24 and 25 October 2013 a seminar on the fib Model Code 2010 takes place in Vienna with a focus on fibre-reinforced concrete, shear force and punching, durability, properties of composite concrete, numeric analyses as well as several other applications.

The seminar addresses practical engineers, surveyors and architects, representatives of authorities and testing laboratories, cement and concrete manufacturers as well as graduates and students of the respective fields. All presentations are held in English.

VCE acts as a sponsor of the seminar.

10.09.2013

SHM Hans-Juergen Schmidt Award 2013

Dr. Helmut Wenzel received this unique award which was created to honour and recognize persons especially from industry or government organizations for their continuing efforts and successful contributions to the field of Structural Health Monitoring and for his outstanding leadership in advancing SHM technologies in industry and government.

30.08.2013

VEESD 2013 & 13. D-A-CH Conference

From 28 to 30 August the VEESD2013 (Vienna Congress on Recent Advances in Earthquake Engineering and Structural Dynamics) took place at the Vienna University of Technology. The 13th D-A-CH Conference, which was held in German, was integrated in the congress. All in all 330 persons from 36 nations particpated.

The congress was co-organized by VCE.

http://veesd2013.conf.tuwien.ac.at/

06.06.2013

International IABSE Conference 2013

From 6 to 8 May the International IABSE Conference 2013 took place in Rotterdam focussing on the topic "Assessment, Upgrading and Refurbishment of Infrastructures".
VCE was represented with two papers including presentations at the conference:

Replacement of Botlek Lifting Bridge, Motorway A15, Netherlands
Robert Schedler, Ulrich Eder, Erik Jille
> Paper | pdf

Integrated Asset Management Tool for Highway Infrastructure
Robert Veit-Egerer, Monika Widmann, Peter Furtner, Rui Lima
> Paper | pdf

05.04.2013

A-Lanes A15 Maasvlakte–Vaanplein

On Friday, 5 April 2013, the transversal girder 304 was successfully installed.

This was the heaviest concrete element of the whole project with a length of 16.80 m, a width of 4.40 m and a height of 2.61 m as well as a total weight of 224 tons.

, ,
15.02.2013

eMagazine austria-architects

New institute building of the University of Vienna

The eMagazine "austria-architects" nominates the new institute building of the University of Vienna in Währinger Strasse in Vienna's 9th district building of the month.

> article: austria-architects

01.12.2012

Award VCE Romania

On Saturday, 01 December 2012, an art gala organized by the district management of the 3rd district took place in Bucharest on the occasion of the national holiday.

In the scope of this gala several persons from the fields of art and music were decorated.

VCE Romania had designed the music and art school in the 3rd district where the gala took place and was awarded a diploma for extraordinary merits in architecture.

» Project

07.11.2012

Building Project Wien-Mitte Opened

On Tuesday, 6 November, the pre-opening of the complex, which is a superstructure over the railway station Wien-Mitte, took place in the presence of the Austrian President Heinz Fischer and Vienna’s Mayor Michael Häupl (SPÖ).

The building will be open to the public from 8 November. Then part of the 30,000 m² shopping centre “The Mall” will also be put into operation. In a first step the local supply for the core area around the railway station shall be restored. Only in April 2013 shall “The Mall” be fully launched with approx. 50 shops.

» project

18.09.2012

Foundation Stone Ceremony Hospital North

On 18 September 2012 the foundation stone for the shell construction works at the Hospital North was laid in presence of City Councillor for Health Sonja Wehsely, Mayor Michael Häupl and Wilhelm Marold (Managing director of KAV, the Vienna Hospital Association).

By 2015 the most modern hospital in Austria with 785 beds is to be completed. A special feature of the new hospital is the complex design of the exterior area with a park landscape (healing gardens) and therapeutic function.

20.06.2012

German Unity Transport Project

New Info-box

On 19 June 2012 the new info-box of the German Railways (DB) for the project VDE 8.2 was inaugurated at the Osterberg Tunnel. Many VIPs were present, including the district administrator of Sachsen-Anhalt, Minister Webel, the coordinator of the overall project VDE 8, Mr. Drescher, the project manager of the section VDE 8.2 new line, Dr.-Ing. Schenkel, as well as Mr. Hagen as person responsible for our trade ballast-less track.

27.04.2012

A15 Maasvlakte – Vaanplein

The works on the building site of the A15 Maasvlakte – Vaanplein are running at full speed! Apart from the setting up of the pile foundations on site, there is assiduous work at the prefabricated parts of the individual sections. In the video the manufacturing of the prefabricated parts for the foundation of the object 5563 in the Vaanplein junction is visible. The weight of the prefabricated component shown amounts to approx. 160 tons.

27.04.2012

Extension of the Underground Railway Line 5 in Berlin

The biggest inner-city traffic project in Berlin has started ...

31.03.2012

Kliplev-Sonderborg Motorvejen

After two years of construction the Kiplev-Sonderborg Motorway in South Denmark was solemnly inaugurated by the Danish Minister for Traffic and Infrastructure on 31 March 2012. The project was carried out in the scope of a PPP model by the Strabag consortium "KMG" (Kliplev Motorway Group) within the contractually agreed deadline. The total construction costs amounted to approx. 130 million Euro. VCE in joint venture with Drees & Sommer Infra Consult fulfilled the tasks of LTA (Lenders' Technical Adviser) for the financing banks and was responsible for schedule review and quality inspection as well as check of the construction progress and the approval of invoices compliant with the services. Due to delays in construction additional services for project control and mediation were taken over on the consortium's request.

14.12.2011

A15 Maasvlakte – Vaanplein, PPP Project, Netherland

Minister Schultz launches major improvement in the accessibility of Rotterdam port area

The Minister Schultz van Haegen (Infrastructure and Environment) today announced the official start of work. "With the approach of the A15, we make the region stronger and more accessible. This is more than a highway project. We will build our infrastructure, both road and rail and water, to better utilise," she said.

28.11.2011

5 Years VCE Romania

On Thursday, 24 November 2011 the jubilee celebration on the occasion of the 5th anniversary of the company VCE – Vienna Consulting Engineers S.R.L. took place in Bucharest. Among others MMag. Edith Predorf, a representative of the Austrian Federal Economic Chamber, as well as Ambassador Dr. Michael Schwarzinger from the Ministry of Foreign Affairs participated in the celebration.

12.11.2011

Opening of Gazela Bridge

After 18 months of construction the rehabilitation measures at the Gazela Bridge in Belgrade over the Sava were concluded so that the bridge could be completely and officially opened to traffic, attended by numerous representatives of the Serbian Parliament, of the city of Belgrade and the Serbian motorway association PE Roads of Serbia as well as of the media. The bridge was opened to traffic earlier than planned due to the efforts of all parties involved, which can be seen as a result of the excellent cooperation.

18.10.2006

Austrian Award for Telematics 2006 Nomination

DyGeS - Dynamisches Gewichtserfassungs-System

The objective of the research activity is the registration of vehicle speed and weight in real time by means of the measurement of the dynamic characteristic of bridges.

11.10.2005

Opening week new building 'College Wels'

Ceremonial opening of the college on Friday, October 14th, 2005

The new building is the new academic home of six college courses, which were housed in up to ten different buildings in Wels until June 2005.

12.07.2005

Opening Handling Center West

On the 6th of July 2005 the Handling Center West was inaugurated. The newly constructed Handling Center West is adjacent to the Air Cargo Center.