This 3,8 km section of Metro Santiago de Chile has been constructed by the joint venture ETF – Colas Rail. VCE was requested to conduct validation test measurements on site.
The scope of these measurements was to verify the parameters that define the vibration mitigation behavior of each section of track, including the validation of the theoretical design parameters such as natural frequencies, excitation spectrum and insertion loss.
VCE performed validation tests at two intervals in Chile. The first measurement campaign focused on the natural frequency and transfer mobilities of various mass-spring systems, determined for loaded and unloaded track condition with artificial force impacts. The second measurement campaign focused on measurements of running trains.
The measurements included a quite detailed investigation of the mitigation measurement systems. ETF – Colas Rail are satisfied with the professionalism and excellence showed during the execution of the activities on site, meetings and reviews.