Skip to main content
Immissionsmessung

SuedOstLink

PROJECT OF THE MONTH APRIL 2024 | Within the scope of the TenneT project SüdOstLink (South-East Link) VCE . FCP IBU was assigned with immission measurements for noise and vibration during construction for two sections.

TenneT is one of the leading transmission system operators in Europe. The SuedOstLink is a planned direct current underground cable between the network node points Klein Rogahn near Schwerin in Mecklenburg-West Pomerania and Wolmirstedt in Saxony-Anhalt with the network node point ISAR near Landshut in Bavaria.

The construction supervision of VCE . FCP IBU comprises the immission measurements in the sections C2 (Marktredwitz to Pfreimd) and D1 (Pfreimd to Nittenau) in Bavaria. The assignment extends to a section of approx. 135 km. Within the engineering consortium VCE . FCP IBU projects are processed in close cooperation of the teams from Austria and Germany.

Projects for the extension of sustainable infrastructure are particularly important to us as a company group. Consequently, we are glad to be able to combine the long-term cooperation with TenneT in the offshore sector with our experience in infrastructure site supervision in immission protection in the scope of this contract.

More information on the project: www.tennet.eu/de/projekte/suedostlink
 

LOCATION

Germany

CLIENT

TenneT

SERVICE

Immission Measurement Noise and Vibrations
 

Close